From the first meeting to the final acceptance of the job - you get the owner Todd Heldt. He is the one you will meet to discuss your job and specific needs - he will be out as part of our professional team completing your job - and he will be the one finalizing the job with you when it's completed.
This insures complete communication throughout the job. We know it takes just a little more effort to do things right. Cutting corner's hurts the integrity of the job for the customer and the long term reputation of the company. Even though Todd Heldt Excavating & Paving has been in business nearly three decades, they have successfully remained a Sacramento paving contractor focused on quality work and customer service.
This insures complete communication throughout the job. We know it takes just a little more effort to do things right. Cutting corner's hurts the integrity of the job for the customer and the long term reputation of the company. Even though Todd Heldt Excavating & Paving has been in business nearly three decades, they have successfully remained a Sacramento paving contractor focused on quality work and customer service.
Services
Todd Heldt Excavating and Paving has many years of experience performing all types of site construction. We are a smaller company that specializes in asphalt repair, driveway paving and railroad track asphalt restoration. Due to our size and low overhead costs, we can provide the customer with a quality product and a very competitive price.
This consists of installing a new layer of asphalt (usually 1.5" to 2" thick) on top of an existing asphalt driveway, parking lot or road. This might also be referred as retop or recap. A hot melt and hot applied rubberized material used to seal cracks larger than to help prevent water penetration and damage to base.
The soil was graded and compacted. Base material was then imported and the driveway was paved to match the existing concrete and the roadway. The job consisted of saw cutting and removing the asphalt. We then removed two sets of railroad tracks that lead to the end of the pier. After all tracks were removed, the areas were paved and subsequently the entire pier was coated with a type II seal coat.
A good contractor will include itemized quantities in their bid. The bid should include the total square footage and thickness of the asphalt. Make sure the bid includes everything discussed. Although the price is the most important, square footage and asphalt thickness amounts are important to assure your getting all the materials you're paying for.
Reviews
Be the first to review Heldt Todd Excavating.
Write a Review