We work to secure water supplies and develop delivery infrastructure for the needs of consumers, fire protection systems, and agriculture. Our potable water supply, treatment, transmission, and distribution systems are providing clean, safe, and reliable drinking water to all users. The reliability of these systems must be maintained.
The awareness of environmental issues in our communities has never been greater. As a result, we are achieving new levels of performance from our water reclamation systems. Improved methods of science and engineering are enhancing our ability to protect public health and our environment, which is the ultimate goal of our profession.
The awareness of environmental issues in our communities has never been greater. As a result, we are achieving new levels of performance from our water reclamation systems. Improved methods of science and engineering are enhancing our ability to protect public health and our environment, which is the ultimate goal of our profession.
Services
The principals and staff of Shaw Engineering make a specific commitment to our clients, including the promise to operate from the highest level of integrity. For us, that means to maintain our reputation by providing the best possible service and expertise in the field, and to be trustworthy, accountable, reliable and accessible.
Shaw Engineering has earned its qualifications through decades of performance handling a wide range of technical challenges. Our depth of experience provides a solid foundation of knowledge that ensures successful projects every time. Shaw Engineering's approach to all project assignments involves a committed client relationship with ongoing and continuous communication.
In 2018 Shaw Engineering was approached by Dyer Engineering (now JUB) for assistance in the design of a booster pump station for the City of Susanville's main spring water source, Cady Springs. The remote site is located on a hillside 3 miles west of Susanville. Portions of the spring collection system are over 100 years old.
The Town of Tonopah's sewer system along Main Street was first placed into service around 1905. The system has undergone some replacements and realignments. US Hwy 95 was installed through town in the 1940's. In 2017, NDOT notified the Town the highway would be reconstructed and would include installation of significant storm drain improvements causing multiple risks and conflicts with the Town's utilities.
Reviews
Be the first to review Shaw Engineering.
Write a Review