Complete rehabilitation of a 3.0 MG water storage tank including de-leading interior and exterior coatings and structural components and design of a new 3 MGD Water Booster Pump Station. Evaluation and design of the replacement of 1.6 miles of 40 year-old 20-inch ductile iron sewer force main with a new 24-inch PVC force main in Newport, RI.
Included
Related categories
Construction companies in Woonsocket, RI