Dolph Rotfeld Engineering, Division of AI Engineers, Inc., P.C, (DRE) provides the broad, multi-disciplinary background needed to solve complex engineering problems. The combined experiences of the staff covers the fields of and construction in both the private and public sectors, with a unique understanding of today's governmental problems and how to solve them.
The firm's strength lies in its ability to deliver a project to both the government client and the private sector client. The firm has been in existence for 30 years, and has prepared plans for engineering work involving hundreds of millions of dollars.
The firm's strength lies in its ability to deliver a project to both the government client and the private sector client. The firm has been in existence for 30 years, and has prepared plans for engineering work involving hundreds of millions of dollars.
Services
From 1989 to 1994, Dolph Rotfeld Engineering, Division of AI Engineers, Inc., P.C. (DRE) was Project Coordinator for the Westchester County and monitored the activities of eight engineering consultants, conducting Sewer System Evaluation Surveys of all local public sewer systems in the thirteen Westchester County Sewer Districts.
City of Yonkers - Intersection of Saw Mill River Parkway and Executive Boulevard Roadway and Drainage Improvements. Provide Site Design and Engineering Services including permitting for multiple commercial properties along NYS. Since 2004 to the present, we conducted studies and prepared methods to bring compliance at the three racetracks with the NYSDEC Concentrated Animal Feedlot Operation (CAFO) regulations.
Dolph Rotfeld Engineering, Division of AI Engineers, Inc., P.C. was lead consultant on the design team for the municipal public works garage and yard expansion project completed in 2004.
The project included rehabilitation of the existing repair garage located in the old armory building, construction of a new 30,000 SF, two level storage garage, offices and lockers, integrated truck wash facility, related parking and outside storage areas, underground fuel tanks, pumps and monitoring system, fabric structure salt storage, installation of a new drainage system, and paving of the entire yard.
The project included rehabilitation of the existing repair garage located in the old armory building, construction of a new 30,000 SF, two level storage garage, offices and lockers, integrated truck wash facility, related parking and outside storage areas, underground fuel tanks, pumps and monitoring system, fabric structure salt storage, installation of a new drainage system, and paving of the entire yard.
Reviews
Be the first to review Dolph Rotfeld Engineering PC.
Write a Review